Trim Road Roundabouts Public Meeting

RoundaboutDear Cardinal Creek Residents,

Please join us at a public meeting to express your views (pros and cons) about roundabouts being planned for Trim Road between Innes and Hwy 174. A total of 5 roundabouts are being proposed. The meeting will take place on

Tuesday, November 29, 2011
6:30 to 8:30 pm
South Fallingbrook Community Centre
998 Valin Street
adjacent to the Maple Ridge Elementary school

Please note that this may be your last chance to provide feedback regarding the roundabouts on Trim Road.

Sincerely yours,
Sean Crossan
President, CCCA

Trim Road Realignment (OR174 to Innes Road)

The City of Ottawa has initiated the design assignment for the realignment of Trim Road, from OR174 to Innes Road. A Schedule ‘C’ Environmental Assessment (EA) for this project was previously completed in September 1998 with subsequent Addendum in August 2002.

The project limits include:  Trim Road (OR174 to Innes Road), Frank Kenny Road (Trim Road to 1.4 km south of Innes Road), St. Joseph Boulevard (OR174 off-ramp to Trim Road) and Old Montreal Road (Trim Road to Dairy Drive). The proposed work involves widening the roadway to 4-lanes including bike lanes and sidewalks / multi-use pathways, and installing watermains and storm sewers.

Construction is scheduled to commence in 2012.
Trim Road Realignment Overview

As mandated by City Council Directive (2007) and the City’s Transportation Master Plan (2008), roundabout assessments were performed for the major intersections in the project area. Intersections selected for implementation include: Trim / Taylor Creek & Dairy, Trim / St. Joseph & Old Montreal, Trim / Springridge & Portobello, Trim & Frank Kenny / (Old) Trim, and Frank Kenny / Innes. In order to comply with the Municipal Class EA process, an addendum is required to reflect the inclusion of roundabouts to the design.

In addition, to accommodate projected traffic volumes, it was determined that an auxiliary right-turn lane is warranted at the Trim / Innes intersection. This item will also be included in the EA addendum.

A meeting is being held to provide information to the residents and affected property owners regarding the proposed works and to receive input and comments from the public and interested parties.  Please note that only the proposed changes presented in the Addendum are open for review.

For more information and / or to submit comments, please contact:

Joe Mojsej, P.Eng., Senior Project Manager
City of Ottawa
100 Constellation Crescent
Ottawa, ON  K2G 6J8
E-mail:  Joe.Mojsej@ottawa.ca
Tel.:  (613) 580-2424 ext. 16203
Fax:  (613) 560-6064

Brian Rogers, P. Eng.
Consultant Project Manager
Robinson Consultants Inc.
350 Palladium Drive
Kanata, ON  K2V 1A8
E-mail:  brogers@rcii.com
Tel.:  (613) 592-6060 ext. 143
Fax:  (613) 592-5995